🌿 ARGONBUILD V2 ECO INTELLIGENCE SUITE ⚑ 25 LIVE SUBDOMAINS (<name>-argonbuildv2.aiperth.co) πŸ“± DESKTOP Β· TABLET Β· MOBILE OPTIMISED

Western Australian Microgrid & Developer Origination Command Centre

Project-First v2 Origination Warehouses (re-engineered from Tom Friberg's workflow), 100% Statutory-Verified Real Deal Packs (WAPC, EPBC, MRS 1441, City of Swan DA386/2026), ERAWA Licensed Microgrid Blueprints, and Anonymised Customer Teasers.

1,652
Unified WA Projects (Project-First v2)
1,521
Shell SPVs Unmasked to Parent Developers
189
Verified WADI Register Projects
7 Real Deals
4 Audit-Clean + 3 Extended + Swan 201.6 MW CDC
4 Licensed
ERAWA EDL7, EDL9, EDL10 & ARENA Precedents

πŸ—οΈ 1. Interactive Project-First v2 Warehouses & Opportunity Engines

Constraint Filters (# Residences/Lots, Land Area sqm/ha, MW Capacity) → Find Projects → Unmask Shell SPVs → Shortlist / Watch
⭐ PRIMARY V2 ENGINE · 1,652 REAL PROJECTS
🌐 tomv2-argonbuildv2.aiperth.co

Project-First Origination Engine v2 (Unified WA Warehouse + WADI)

Full implementation of Tom's 4-step workflow across 1,652 WA projects and 627 organisations. Unmasks 1,521 single-asset shell SPVs (e.g., 108 Stirling St Pty Ltd → Erben 351 dwellings; Montario Project Pty Ltd → Celsius 298 dwellings) and surfaces electrical/civil gatekeepers (UPD, Cossill & Webley).

🏠 # Residences / Lots Filter πŸ“ sqm & ha Land Filter ⚑ MW Capacity Filter β˜… Shortlist / Watch Triage
βœ… VERIFIED WADI REGISTER Β· 189 PROJECTS
🌐 zenith-v2-argonbuildv2.aiperth.co

WADI-Only Project-First CRM v2 (Zenith Full & Public Stripped Skins)

Strictly the 189 verified WA developments from WADeveloperIntelligence.sqlite, flipped from Company-First to Tom's Project-First workflow with dwelling/lot, land area (ha/sqm), and MW capacity sliders plus persistent Shortlist / Watch / Pass workflow.

πŸ”’ Zenith Full Edition (189) 🌐 Public Stripped Edition (189)
⚑ 12 INTERACTIVE MODULES · SWIS CONSTRAINTS
🌐 opportunity-engine-argonbuildv2.aiperth.co

Zenith Connected Energy Opportunity Engine

12-module WA Microgrid & Embedded Network Origination platform combining 776 corridor projects, 429 developers, 505 upstream engineering/planning gatekeepers, and 14 constrained Western Power sub-networks.

⚑ 14 Constrained Sub-Networks 🧭 505 Gatekeepers πŸ“Š Interactive Sizing

βœ… 2. Real Statutory-Verified WA Deals (Unredacted vs. Anonymised Teasers)

100% Real WAPC Structure Plans, MRS Amendment 1441, EPBC Referrals & City of Swan DA-386/2026
βœ… 100% STATUTORY-VERIFIED Β· 4 REAL DEALS πŸ”’ TEASER EDITION AVAILABLE
🌐 deals-argonbuildv2.aiperth.co

Audit-Clean 4-Deal Origination Pack (8-Page Combined + Individual Deals)

Zero speculative assumptions β€” every metric is anchored to live WA statutory filings: (1) Qube Property Group East Wanneroo Precinct 8 (261.96 ha, 2,500 homes), (2) Troon Group 201 Stock Rd Bullsbrook ($79.8M, 180 ha, 130 industrial lots), (3) Land Group WA Ballajura MRS 1441 (53.6 ha, 776 dwellings), (4) Waterways Coodanup EPBC 2026/10595 & BMP Pinjarra.

βœ… REAL $417M / 201.6 MW DA FILING
🌐 cdc-datacentre-argonbuildv2.aiperth.co

City of Swan DA-386/2026 Β· Canberra Data Centres (CDC) 201.6 MW Campus

Complete engineering & planning intelligence dossier on CDC's $417M hyperscale data centre at Lot 202 (253–293) Milner Road, High Wycombe / Hazelmere fringe (201.6 MW load, 84 × 4.0 MVA standby diesel gensets, 132 kV Western Power connection).

πŸ“— EXTENDED 6-DEAL PACK Β· 12 PAGES πŸ”’ TEASER EDITION AVAILABLE
🌐 deals-6x2-argonbuildv2.aiperth.co

Full 6-Deal Origination Pack (Adds Fife Capital, Ciraterra & Providence)

Includes all 6 WA origination targets (12 pages total): Troon Bullsbrook, Fife Capital & Wallace PM South Forrestdale Stage 2, Ciraterra Kemerton SIA Green Industrial Precinct, Qube East Wanneroo, Wolfdene/BMP Pinjarra, and Providence Lifestyle 3-Village Portfolio.

πŸ“‹ Individual Real Deal Sheets β€” Side-by-Side Unredacted Real vs. Anonymised Teaser Editions (HTML + Printable A4 PDF)
Real Project & Proponent Statutory Filing / Gatekeepers Scale & SWIS Corridor βœ… Real Unredacted Edition πŸ”’ Anonymised Bait Teaser
Deal 1: Qube Property Group β€” East Wanneroo Precinct 8 ("Ranch Road", Mariginiup) WAPC Precinct 8 Structure Plan Β· Cossill & Webley (Civil), Hatch RobertsDay (Planning), Emerge (Env) 261.96 ha Β· ~2,500 Dwellings Β· Wanneroo 132/22 kV Corridor
Deal 2: Troon Group β€” 201 Stock Road, Bullsbrook ("Northern Gateway Industrial Park") $79.8M Subdivision Β· UPD (HV Electrical), Cossill & Webley (Civil), CLE Town Planning 180 ha Β· ~130 Heavy/General Industrial Lots Β· Muchea/Bullsbrook Corridor
Deal 3: Land Group WA β€” Lakefarm Retreat Urban Precinct, Ballajura WAPC MRS Amendment 1441 Β· Taylor Burrell Barnett (Planning), Emerge Associates (Env) 53.6 ha Β· ~776 Dwellings Β· Malaga/Alexander/Beechboro Corridor
Deal 4: Waterways Coodanup & BMP Pinjarra (Peel Growth Corridor) Commonwealth EPBC Referral 2026/10595 + Peel Region Scheme Structure Plan 41.8 ha (450–500 Lots) + Pinjarra Urban Growth Β· Mandurah/Pinjarra Corridor
Deal 5 (6-Pack #02): Fife Capital & Wallace PM β€” South Forrestdale Industrial Stage 2 SPV: TAP V Forrestdale 2 Pty Ltd Β· Armadale Industrial Growth Precinct Heavy & Logistics Industrial Estate Β· Forrestdale/Byford Constrained Feeder
Deal 6 (6-Pack #03): Ciraterra β€” Kemerton SIA Circular Materials & Catalpa Dr Precinct Kemerton Strategic Industrial Area (SIA) Β· High-Density Industrial Processing Load Kemerton 132/33 kV Industrial Feeder Β· South West SWIS
Deal 7 (6-Pack #06): Providence Lifestyle β€” 3-Village Land-Lease Embedded Network Portfolio Repeatable Land-Lease Embedded Network Architecture (Bullsbrook, Champion Lakes, Two Rocks) 3 Multi-Stage Lifestyle Villages Β· 100% Behind-the-Meter Solar + BESS

πŸ—ΊοΈ 3. Real Operating & Licensed WA Microgrid Precedents (ERAWA EDL7, EDL9, EDL10 & ARENA)

10-Phase Reverse-Engineered Lifecycle Blueprints from Concept Structure Plan to ERAWA Licence Grant
βœ… ERAWA LICENCE EDL7 Β· OPERATING

01: Peel Business Park, Nambeelup (DevelopmentWA + Peel Renewable Energy / Zenith)

WA's flagship industrial renewable microgrid (1.2 MW solar + 2.5 MWh BESS + private HV/LV distribution network) operated by Zenith Energy subsidiary Peel Renewable Energy Pty Ltd.

βœ… ERAWA LICENCE EDL10 Β· OPERATING

02: Eglinton Village (Cedar Woods + Eglinton Village Energy / Kleenheat)

1,300-lot (84.5 ha) masterplanned residential community microgrid in Wanneroo northern growth corridor under ERAWA Electricity Distribution Licence EDL10.

βœ… ERAWA LICENCE EDL9 Β· LICENSED

03: Ocean Reef Marina (DevelopmentWA + Peel Renewable Energy)

1,000+ dwelling coastal mixed-use marina precinct microgrid licensed under ERAWA EDL9, demonstrating high-density apartment + commercial marine embedded network integration.

βœ… ARENA PILOT Β· OPERATING

04: East Village at Knutsford, Fremantle (DevelopmentWA + Powerledger)

36 survey-strata townhouses sharing a 670 kWh community battery and peer-to-peer solar trading network without requiring a full distribution licence.

🌏 4. NSW Regulatory Proof & WA v1 Reference Portals (<name>-argonbuildv2.aiperth.co)

East-Coast IPART/AER Embedded Network Precedents & Original v1 Company-First Baseline
🌏 NSW IPART / AER PROOF SUITE
🌐 nsw-proof-argonbuildv2.aiperth.co

NSW Embedded Network & Microgrid Proof Portals (3 Editions)

Interactive NSW regulatory proof, explorer, and redesigned comparison portals demonstrating how East-Coast developers structure greenfield embedded networks.

πŸ›οΈ V1 COMPANY-FIRST BASELINE
🌐 zenith-v1-argonbuildv2.aiperth.co

WA Developer Intelligence v1 (Original Company-First CRM)

Preserved v1 Company-First CRM baseline for side-by-side comparison against the new Project-First v2 workflow (`tomv2-argonbuildv2.aiperth.co` and `zenith-v2-argonbuildv2.aiperth.co`).